Client
Private
Location
Hartsholme, Lincoln
Duration
3 Days
Description
DROP KERB installation , Hartsholme, (Lincoln)
- Hedge removed.
- Existing slabs and spoil removed down to 200mm.
- Flat topped path edgings installed and concreted in.
- Two tapered kerbs and four dropped kerbs installed and concreted in.
- 100mm of type 1 road stone imported and compacted.
- 75mm of 20mm base course Tarmac imported and compacted.
- 25mm of 6mm Tarmac topping imported and compacted to finish.
- Two 8 inch thick gate post installed and concreted in.