Drop Kerb Installation, Hartsholme, Lincoln

Client

Private

Location

Hartsholme, Lincoln

Duration

3 Days

Description

DROP KERB installation , Hartsholme, (Lincoln)

  • Hedge removed.
  • Existing slabs and spoil removed down to 200mm.
  • Flat topped path edgings installed and concreted in.
  • Two tapered kerbs and four dropped kerbs installed and concreted in.
  • 100mm of type 1 road stone imported and compacted.
  • 75mm of 20mm base course Tarmac imported and compacted.
  • 25mm of 6mm Tarmac topping imported and compacted to finish.
  • Two 8 inch thick gate post installed and concreted in.