Client
UCPC, Balfatech
Location
Elton, Newark
Duration
5 Weeks
Description
DNO Substation built in approximately 5 weeks for clients Balfatech/UCPC as part of a 10MW Solar farm in Elton (Nottinghamshire)
The build included...
- All excavation and waste disposal.
- All earthing and low voltage electric installation.
- Roof and drainage installation.
- Concrete footings and plinth work.
- Concrete blockwork outside and inside.
- Coloured Rendering.
- All fixtures and fittings.
- Gravel footpath and concrete installation pad outside main doors.
- The substation was completed 1 week ahead of schedule and was also part of a 3000m underground excavation scheme 'Integral utilities ltd' also undertook and successfully completed SAFELY and with no incident or complaint,(Further post and pictures to be updated).