Client
Stormport
Location
Grantham
Duration
5 Days
Description
Oversized RMU substation plinth installed for customer 'Stormport professional services limited' in Grantham (Lincolnshire).
This specially designed plinth was built from a bottom 150mm concrete base with 7 courses of concrete blocks incorporating 125mm polypipe ducts either side for cable installation.
The top base was laid with a fibre concrete mix into our specially designed wooden shuttering allowing for extra reinforcement.