Client
Morrison Utilities / WPD Contract
Location
Holbeach
Duration
6 Days
Description
- New substation installation in Holbeach (Lincolnshire).
- This included the removal of all the old switch gear.
- Excavation outside to allow for cable jointing.
- Removal of old substation concrete base.
- New concrete base installed.
- Red gravel chipping's imported and installed.
- Removal of old surrounding fencing and supply and fit of a new one!
- Tarmac pathway put back to highway's spec.