Client

Morrison Utilities / WPD Contract

Location

Holbeach

Duration

6 Days

Description

  • New substation installation in Holbeach (Lincolnshire).
  • This included the removal of all the old switch gear.
  • Excavation outside to allow for cable jointing.
  • Removal of old substation concrete base.
  • New concrete base installed.
  • Red gravel chipping's imported and installed.
  • Removal of old surrounding fencing and supply and fit of a new one!
  • Tarmac pathway put back to highway's spec.