Client
Western Power Distribution
Location
Lincoln
Description
Integral utilities ltd are pleased to be involved in installing the electric cable and fibrecrete plinths for two new electric car power points at Western Power Distribution's Lincoln depot.
The project involved excavation and reinstatement in the depot car park C/W, Installation of 2x 75mm polypipe flexiducts, 2x earth rod inspection pits, earth wire installed and the casting of two fibrecrete plinths that will soon each hold electric points for the staff to charge their newly delivered electric work vehicles.