T: 01522 275 069

E: info@integralutilityservices.co.uk

Menu

Nottinghamshire & Lincolnshire's Leading

Utility & Highway Contractors

Telecoms, Water, and Gas Installations

Electricity, Telecoms, Water, and Gas Installations

High Standard of Work, Performed Safely and Efficiently

High Standard of Work, Performed Safely & Efficiently

20 Years Experience in Full Highway Excavation and Reinstatement

20 Years Experience in Full Highway Excavation & Reinstatement

Full Trench Digging for Duct and Cable Laying

Full Trench Digging for Duct & Cable Laying

Integral Utility Services Ltd are one of Lincolnshire and Nottinghamshire's leading utility and highway contractors.

We specialise in full highway excavation(s) and reinstatement(s) to all the leading utility companies and have over 20 years experience in this field.

We offer full trench digging, impact moling, duct/cable laying, telecoms, gas, water installation, and full reinstatement which is provided by our civil's side which includes all tarmacadam, rigid, modular reinstatements.

As well as offering full permanent reinstatement we have the support of two 8-wheeled 16-ton grab lorries to assist all our general backfilling needs.

We pride ourselves on our high standard of work which is carried out safely and efficiently. We aim to complete the job safely without any incident or utility strikes. We recycle materials where possible and we are an environmentally friendly company.

Our customers are our priority from day one and we work with them to deliver their objectives and goals.

Our Services

  • Trench Digging
  • Impact Moling
  • Cable / Duct Laying
  • Permanent Reinstatement
  • Electricity
  • Gas
  • Water
  • Telecoms
  • Civils
  • General Building Work
  • Grab Lorries
  • NRSWA Accredited

We Guarantee

  • Excellent Standard of Work
  • Safety
  • Reliable
  • Professional
  • Great Customer Service
  • Helpful
  • Experienced
  • Care
  • Efficiency

Latest Projects

Teal Park, Utilities Track Work

Teal Park, Utilities Track Work

3KM Track Work for Elton Solar Farm, Newark

3KM Track Work for Elton Solar Farm, Newark

Substation Change, North Shore Golf Club, Skegness

Substation Change, North Shore Golf Club, Skegness

Impact Moling, Wyberton, Boston

Impact Moling, Wyberton, Boston

"Please can you pass on a thank you from myself and also a customer Mr Shaw (landowner and farmer) for notice 1968893.

This was a HV rebuild and HV undergrounding scheme in Friskney back in December 2016.

The reason I would like to thank Integral is, during the excavation works half way through the turf works in verge it was discovered to be an old road under the turf. This put a lot of extra hard work into meeting the jointing date, as the teams had to remove turf for the full length of trench works (approximately 70 meters) and then use the pecker to break out the old road which is very time consuming. This was unexpected, even so Ben reassured myself of meeting my jointing date and the integral digging teams worked into darkness to make sure the ground was out and cable in the ground on date.

If they would of missed the jointing date this would of caused myself and WPD a lot of hassle and more expense with shutdowns and generator costs due to this being a HV rebuild scheme with HV shutdown dependant on jointing date being met.

I would like to personally thank integral from the start through to the completion of the scheme.

1st from the pre site with myself and Henry Eden.

2nd from the ongoing talks with Ben Eden to reassure me they will meet my jointing date and i believe he did the call pull himself.

3rd to the digging teams for their hard work and willing to work late to meet jointing date.

4th and finally to the reinstatement gang who Mr Shaw the farmer was most impressed with.

Finally the landowner was impressed with Integrals professionalism and on the reinstatement for the completion of works."

David Nicholls, Western Power Distribution

"Gents, Last week I had two schemes on, which were very involved and had to be done during the school half term holidays.
This placed additional pressure on ourselves and MUS to complete to keep neighbours and LCC happy.
Various traffic management was required as well.

Thankfully everything went off without a hitch on both schemes.

Thanks to all involved."

Paul Burnett, Western Power Distribution

"Hi Jenny,

I've been to site to look at the work.

I'm happy that the job is complete assuming the box has everything in it that it should. 

The block paving has been put back brilliantly, I'm very happy with the quality of the finish.

Thank you

John"

John Thompson, Wester Power Distribution

"I'm heavily involved in solar farm connections all over the world, predminantly UK. Over the last 5 years, we have used a lot of contractors before coming across Integral Utilites and will not use anyone but them from now on."

Jose Gonzalez, MD of UCP Choice

"I must thank Integral for the plinth base now finished is very good quality work.

Please pass my thanks onto the relevant gangs that worked on this job."

Dave Miller, WPD